SWMM5 - Stormwater Management Model

SWMM 5, Watersheds, Water Quality,Hydrology, Hydraulics - Watersheds

In the newest version of EPA SWMM (5.0.1.11), there is a new feature of allowing for Add-ins and third-party tools. One such Add-in, the Microsoft Excel, can be very helpful for input data editing and model calibration.

1. To activate the Add-in
This process is detailed in pp. 141 of the EPA SWMM manual (http://www.epa.gov/ednnrmrl/models/swmm ... manual.pdf). Basically the user needs to go to "Tools->Program Preferences->Configure Tools" on SWMM main menu. Then in the pop-up "Tool Options" menu choose "Add." A "Tool Properties" window will pop-up, and the user can assign a name to the Excel Add-in for the "Name" field. For the "Program" field, the user needs to navigate to the location of the Excel executable file at "C:\Program Files\Microsoft Office\Office10\Excel.exe" (the file path may vary). Leave the "Working Directory" field as blank, and choose "INPFILE" macro for the "Parameters" field. Check both "Disable SWMM while executing" and "Update SWMM after closing."

After the above is set up, click OK and the Excel Add-in is registered in SWMM5. The Add-in tool is under the "Tools" menu. One important thing now is to go to "Tools->Program Preferences," and in the pop-up window check "Tab Delimited Project File."

2. Use the Excel Add-in
The SWMM5 input file by default is a tab-delimited .txt file. The user can view the file using Wordpad, but the editing is not very convenient, especially when it comes to calibration for a watershed with large number of subbasins. The Excel Add-in provides great relief for such operations.

Create a simple watershed model in SWMM, and then go to "Tools->Excel Editor (or whatever the user names the Add-in)." The input file for the watershed model is then displayed in tab-delimited format in Excel. In this environment, the user can edit the input data much easier (as compared to double-click each model component and key in the values in the Graphic User Interface). This becomes more apparent when the number of subbasins increases. When the editing is finished, close the Excel program, and then click "YES" or "OK" to all the pop-up windows. After that, the SWMM model interface pops back and the input parameters are updated.

So with this knowledge the model setup process can be much easier. In the initial model setup, the user may not bother to input any parameter values (i.e. subbasin area, width, slope, etc.). Instead, the model can be delineated and all components represented. Then the user can open the "Excel Editor" and copy/paste the model parameter values from another table of pre-created input parameter values (which is always the case). This process will totally by-pass the manually key-in of parameter values.

The second case of this feature applies is the model calibration. In a traditional way, suppose the user needs to change the value of depression storage for the impervious area. That means for a 30-subbasin watershed, the user needs to roam around the watershed and double-click 30 times to finish that single parameter change. Imagine if it takes five times to find the best value for that single parameter. With this feature, the user can open up the input file, set a depression storage value for the first subbasin, and then drag down for all the other 29 subbasins. Close Excel and go back to SWMM, and the updated model can be ran immediately.

Source:  http://ceeforums.com/forum/viewtopic.php?f=26&t=256&p=582#p582

Last updated by Robert E Dickinson Apr. 20, 2008.

Latest Activity

The time step used during the simulation at any one time is the minimum of the link and node time steps. As the example shown below shows usually the link time step (based on the CFL) condition is more restrictive than the node time step. In the ima…
on Wednesday
Xiaoyan Huang is now a member of SWMM5 - Stormwater Management Model
July 22
Robert E Dickinson added a blog post
Shanghai Makes MWH Soft’s InfoWorks WS Solution Its Water Distribution Modeling Platform Largest City in World’s Most Populous Country Looks to Advanced MWH Soft Technologyto Improve Drinking Water Operations and Planning Broomfield, Colorado US…
July 14
July 13
Alan is now a member of SWMM5 - Stormwater Management Model
July 13
Robert E Dickinson added a blog post
From a Stanford University Study as described in Science Daily Seasonal records The Stanford team also forecast a dramatic spike in extreme seasonal temperatures during the current decade. Temperatures equaling the hottest season on record from 19…
July 11
July 11
Reza Imani is now a member of SWMM5 - Stormwater Management Model
July 11
Robert E Dickinson added a blog post
New MWH Soft InfoWater V8 Is First Hydraulic Modeling Software for ArcGIS 10 Eighth Generation Shows Company’s Commitment to ArcGIS Platform Broomfield, Colorado USA, July 7, 2010 — MWH Soft, a leading global innovator of wet infrastructure mode…
July 7
Basil Jamison is now a member of SWMM5 - Stormwater Management Model
July 5
Robert E Dickinson added a page
July 4
Robert E Dickinson added a blog post
Routing Time Step Summary
July 3
Robert E Dickinson added a page
July 3
Robert E Dickinson added a blog post
Explicit Iteration Hydraulic Computation and Implicit Time Step Hydraulic Computations in SWMM 5 The dynamic wave solution in SWMM 5 and InfoSWMM uses an interlocking explicit iteration in an overall time step implicit calculation of the node dep…
July 2
A blog post by Robert E Dickinson was featured
MWH Soft Launches Technical Webinar Series Inaugural Eight-Week Series for Wet Infrastructure Utilities and Consultants Begins July 16 Broomfield, Colorado USA, June 30, 2010 — MWH Soft, a leading global innovator of wet infrastructure modeling…
June 30
Robert E Dickinson added a blog post
MWH Soft Launches Technical Webinar Series Inaugural Eight-Week Series for Wet Infrastructure Utilities and Consultants Begins July 16 Broomfield, Colorado USA, June 30, 2010 — MWH Soft, a leading global innovator of wet infrastructure modeling…
June 30
Joaquim Egea i Martinez is now a member of SWMM5 - Stormwater Management Model
June 24
Robert E Dickinson added a blog post
MWH Soft Unveils Highly Anticipated InfoWorks TS for Comprehensive Hydraulic Transient Analysisof Water Distribution Systems Fourth Quarter 2010 Release to Deliver Unprecedented Transient Modeling Capabilities for Better Decision-Making Broomfiel…
June 16
Aren Matta added a discussion
Hello All   I was wondering if any of you have worked on CSO control alternatives as the city i reside is looking for alternatives assessment.   Some of the alternatives we have are :     Satellite Treatment WWTP's (There has to be more than storage…
June 15
Robert E Dickinson added a blog post
The “Hockey Stick” evolution By andyrussellThis is a post that aims to go through the evolution of the “Hockey Stick” from 1990 to the present day. It naturally misses out parts of the story, which deserve far more analysis, simply to keep the post…
June 15

© 2010   Created by Robert E Dickinson.

Badges  |  Report An Issue | SWMM 5 Blog  |  Terms of Service